Breadcrumbs
- You are here:
- Home
- Forums
- DIscussions
- Tech Help
- General
- AD 54-26-02 Fraying of control cable at the top of control column assembly
- Forums
- DIscussions
- Tech Help
- General
- AD 54-26-02 Fraying of control cable at the top of control column assembly
AD 54-26-02 Fraying of control cable at the top of control column assembly
- Matt Gunsch
- Offline
Less
More
- Posts: 453
25 Jul 2024 16:50 #1
by Matt Gunsch
A&P, IA, PPSEL
too many years GA and Warbird Maint
Check out the Ercoupe Discussion group on facebook
Replied by Matt Gunsch on topic AD 54-26-02 Fraying of control cable at the top of control column assembly
there was a write up about that in coupe capers several years ago,
A&P, IA, PPSEL
too many years GA and Warbird Maint
Check out the Ercoupe Discussion group on facebook
Please Log in or Create an account to join the conversation.
- Larry Snyder
- Offline
Less
More
- Posts: 707
09 Jul 2024 13:53 #2
by Larry Snyder
Replied by Larry Snyder on topic AD 54-26-02 Fraying of control cable at the top of control column assembly
Installing the new format quadrant obviates the need for the inspections. Apparently the original quadrant bent the cable too sharply and a new one was designed to fix it. Sorry, I don’t have part numbers.
Please Log in or Create an account to join the conversation.
- Charlie Quandt
- Topic Author
- Offline
Less
More
- Posts: 6
09 Jul 2024 10:44 #3
by Charlie Quandt
AD 54-26-02 Fraying of control cable at the top of control column assembly was created by Charlie Quandt
This AD calls for the removal of these cables every 100 hours, so that they can be replaced if not in "perfect" condition. I used a borescope to check mine and discovered some corrosion where they wrap into their attachment point. My question is, 1) should I remove them in place or am I better off pulling the whole control column out for a rebuild?
2) The AD lists 4 approved modifications that if installed, eliminate the 100 hour inspection. Does anyone know what these might entail?
2) The AD lists 4 approved modifications that if installed, eliminate the 100 hour inspection. Does anyone know what these might entail?
Please Log in or Create an account to join the conversation.
- Forums
- DIscussions
- Tech Help
- General
- AD 54-26-02 Fraying of control cable at the top of control column assembly
Time to create page: 0.122 seconds